ÁitFoirne

Rota and staffing

Understand WTE and workforce capacity

How ÁitFoirne compares contracted staff capacity with the cover your requirements need, using whole-time equivalents.

Administrator

What this area is for

The WTE area compares your home's contracted staff capacity with the capacity implied by your shift requirements for a chosen week.

Instead of comparing lists of names or raw hours, WTE puts both sides on the same scale: full-time equivalents.

WTE answers the question: if one full-time person equals our full-time week, how many full-time people do we have available, and how many does this week's cover need?

Only administrators and managers with the WTE permission can open these pages.

What WTE means

WTE stands for whole-time equivalent. It expresses staffing in full-time units rather than headcount:

  • 1.0 WTE is one person working a full week as defined in Configuration, for example 39 hours.
  • Someone contracted for half of that week is about 0.5 WTE.
  • Two full-time people are about 2.0 WTE.

It is useful because staff have different contract hours and shifts have different lengths and unpaid breaks. WTE in ÁitFoirne is for planning and oversight. It is not payroll, holiday balance or attendance.

The main tabs

  • Analysis — weekly Available, Required and Gap figures, filters and trends.
  • Daily — day-by-day required hours, and whether each day is under, OK or over filled.
  • Exports — Excel or PDF summaries using the same rules as Analysis.
  • Configuration — the home's full-time weekly hours and an optional target.

How the figures are built

Available WTE is contracted capacity:

  1. Take the active employees in scope, either all departments or one department if you filter.
  2. Add up their maximum hours per week.
  3. Divide by your full-time weekly hours.
  4. Placeholder profiles such as Worker Missing and agency placeholders are excluded.

Required WTE is the cover your requirements ask for:

  1. Look at the shift requirements for the selected Monday to Sunday week.
  2. For each requirement, take the shift type's paid hours, which is the shift length minus unpaid break minutes, and multiply by the number of workers required.
  3. Add those paid hours for the week.
  4. Divide by your full-time weekly hours.

Gap is Available WTE minus Required WTE.

Reading the Gap status

  • Zero or above — spare capacity, shown in green. Contracts meet or exceed this week's requirements.
  • Between zero and minus 0.5 — a slight shortfall, shown in amber. Watch it and plan.
  • Worse than minus 0.5 — understaffed, shown in red. There is a clear shortfall against requirements.

The Daily tab uses different words. Under, OK and Over describe whether the number of people scheduled matches the requirement for that day.

Step-by-step: set the full-time baseline

  1. Open WTE, then Configuration.
  2. Confirm the nursing home name used on reports.
  3. Set Full-time hours per week. This defines 1.0 WTE for your home.
  4. Optionally set a Target number of WTE as a planning goal.
  5. Select Save Changes.
  6. Return to Analysis and refresh the week you care about.

Lowering the full-time hours converts the same contracted hours into a higher Available WTE and the same requirement hours into a higher Required WTE. Both move, so review the Gap again after any baseline change.

Important notes

  • Configuration does not set required WTE per department. Required WTE comes from Requirements and shift types in the Schedule area.
  • It does not change employee contract hours, which live on the employee record as maximum hours per week.
  • Target WTE is a planning reference only. It does not change Required WTE or the Gap.
  • If your home pays all breaks, set the unpaid break minutes on those shift types to zero so paid hours equal the full shift length.

Questions people ask

Why does WTE say we are understaffed even though all shifts are filled?

Filling shifts is a scheduling question. The WTE Gap compares contract hours with the paid hours your requirements imply. You can fill every slot and still have contracts that do not add up to the capacity those requirements need.

Why is one department green and another red?

Each department has its own mix of contracted hours and requirement rows. Filter Analysis by department to see both sides clearly.

Who is excluded from Available WTE?

Inactive staff and placeholder profiles such as Worker Missing and agency placeholders. Real agency people set up as normal employees with contracted hours are included like anyone else.

Does the Target WTE fix a red Gap?

No. The target is a planning reminder. To improve the Gap you need to change contracts, requirements, or both.

Back to Rota and staffing All Help Centre topics

Still need help?

Contact ÁitFoirne support and tell us what you are trying to do. We will point you to the right guide or walk through it with you.

Contact support
Back to top